(a) General. Subject to section 217.400(b)(2), a company identified
as a global systemically important BHC pursuant to section 217.402
must calculate its GSIB surcharge on an annual basis by December 31
of each year. For any given year, subject to paragraph (d) of this
section, the GSIB surcharge is equal to the greater of:
(1) The method 1 surcharge calculated in
accordance with paragraph (b) of this section; and
(2) The method 2 surcharge calculated in
accordance with paragraph (c) of this section.
(b) Method 1 surcharge.
(1) General. The method 1 surcharge of a global systemically important
BHC is the amount set forth in Table 1 of this section that corresponds
to the global systemically important BHC’s method 1 score, calculated
pursuant to section 217.404.
Table 1 to section
217.403—Method 1 surcharge
Method 1 score |
Method 1 surcharge |
Below
130 |
0.0
percent |
130-229 |
1.0
percent |
230-329 |
1.5
percent |
330-429 |
2.0
percent |
430-529 |
2.5
percent |
530-629 |
3.5
percent |
(2) Higher method 1 surcharges. To
the extent that the method 1 score of a global systemically important
BHC equals or exceeds 630 basis points, the method 1 surcharge equals
the sum of:
(i) 4.5 percent; and
(ii) An additional 1.0 percent for each
100 basis points that the global systemically important BHC’s score
exceeds 630 basis points.
(c) Method 2 surcharge.
(1) General. The method 2 surcharge of a global systemically important BHC is
the amount set forth in Table 2 of this section that corresponds to
the global systemically important BHC’s method 2 score, calculated
pursuant to section 217.405.
Table 2 to section
217.403—Method 2 surcharge
Method 2 score |
Method 2 surcharge |
Below
130 |
0.0
percent |
130-229 |
1.0
percent |
230-329 |
1.5
percent |
330-429 |
2.0
percent |
430-529 |
2.5
percent |
530-629 |
3.0
percent |
630-729 |
3.5
percent |
730-829 |
4.0
percent |
830-929 |
4.5
percent |
930-1029 |
5.0
percent |
1030-1129 |
5.5
percent |
(2) Higher method
2 surcharges. To the extent that the method 2 score of a global
systemically important BHC equals or exceeds 1130 basis points, the
method 2 surcharge equals the sum of:
(i) 6.5 percent; and
(ii) An additional
0.5 percent for each 100 basis points that the global systemically
important BHC’s score exceeds 1130 basis points.
(d) Effective
date of an adjusted GSIB surcharge.
(1) Increase
in GSIB surcharge. An increase in the GSIB surcharge of a global
systemically important BHC will take effect (i.e., be incorporated
into the maximum payout ratio under Table 1 to section 217.11) on
January 1 of the year that is one full calendar year after the increased
GSIB surcharge was calculated.
(2) Decrease in GSIB surcharge. A
decrease in the GSIB surcharge of a global systemically important
BHC will take effect (i.e., be incorporated into the maximum payout
ratio under Table 1 to section 217.11) on January 1 of the year immediately
following the calendar year in which the decreased GSIB surcharge
was calculated.